Case Study: Pure Gym Bayswater Horton 4-4200 Bi-Folding Door Installation

Introduction to the Project

Pure Gym approached us to carry out an entrance system installation at their Bayswater location in London. The project involved upgrading access to the facility while preserving the existing all-glass frontage and maintaining the sleek aesthetic expected across their sites.

The primary goals were:

  • Seamless integration with the existing façade
  • Maximising entryway space
  • Ensuring reliable, high-traffic functionality

Why We Used Horton Automatics – Horton 4-4200 Bi-Folding Door System

Given the site constraints and the client’s performance expectations, we recommended the Horton 4-4200 bi-folding automatic door system.

This system offered:

  • Compact footprint – ideal for tight spaces
  • Smooth, quiet operation – perfect for high-traffic fitness facilities
  • Durability and reliability – designed for constant use

Horton Automatics provided the ideal solution in balancing functionality with appearance

Challenges

The most significant challenge was the existing all-glass frontage. Retrofitting a new door system into this structure required:

  • Careful structural assessment
  • Custom fitting without damaging or altering the existing glass
  • Minimal visual impact while ensuring full compliance with safety and access standards

The complexity of the site meant our team needed to work precisely and efficiently to avoid disruption to the facility’s operations.

Benefits of Our Product – Impact and Results

The Horton 4-4200 system delivered on all fronts:

Space-saving design – The bi-folding mechanism maximised the usable entrance width without requiring additional clearance.
Enhanced accessibility – Smooth, automatic operation improved access for all users, including those with mobility needs.
Aesthetic alignment – The frameless glass panels blended perfectly with the existing frontage, maintaining Pure Gym’s brand standards.
Client satisfaction – The project was completed on time, and the client expressed satisfaction with the finished result and minimal disruption during install.