Pure Gym approached us to carry out an entrance system installation at their Bayswater location in London. The project involved upgrading access to the facility while preserving the existing all-glass frontage and maintaining the sleek aesthetic expected across their sites.
The primary goals were:
Given the site constraints and the client’s performance expectations, we recommended the Horton 4-4200 bi-folding automatic door system.
This system offered:
Horton Automatics provided the ideal solution in balancing functionality with appearance
The most significant challenge was the existing all-glass frontage. Retrofitting a new door system into this structure required:
The complexity of the site meant our team needed to work precisely and efficiently to avoid disruption to the facility’s operations.
The Horton 4-4200 system delivered on all fronts:
Space-saving design – The bi-folding mechanism maximised the usable entrance width without requiring additional clearance.
Enhanced accessibility – Smooth, automatic operation improved access for all users, including those with mobility needs.
Aesthetic alignment – The frameless glass panels blended perfectly with the existing frontage, maintaining Pure Gym’s brand standards.
Client satisfaction – The project was completed on time, and the client expressed satisfaction with the finished result and minimal disruption during install.